COAP Local voices. Public accountability. Explore our archive and documentary in progress.
COAPLOCAL VOICES. PUBLIC ACCOUNTABILITY.
← Projects & FOI

COWICHAN ESTUARY / SOURCE COLLECTION

Estuary:
facts and records.

The decisions, technical assessments and competing positions behind the public discussion—with a guide to the pages that matter.

7 PDFs · 244 pages · Collection reviewed November 16, 2026

Start with the question.

  • Farmland capability: ALC paragraph 68 distinguishes present condition from potential with improvements.
  • What the court ordered: the old petition was dismissed by consent, without a hearing, with the force and effect specified in the order.
  • Neighbouring flood risk: read the mitigation conclusions together with the design conditions.
  • Groundwater: read the favourable assessment alongside well-integrity conditions and monitoring recommendations.

Decision · 43 pages · 2.5 MB

ALC decision — August 11, 2025

Present secondary capability, improvable to approximately 91% prime and 8% secondary. Accepts camas production as farming. Does not determine the contract dispute or aquifer impacts.

Where to look: PDF pages 29–35; paragraphs 59–75, especially 68 and 73.

Court order · 3 pages · 0.6 MB

Consent dismissal order — April 29, 2026

Dismisses the petition by consent, without hearing or costs, with merits-equivalent force and effect. Gives no reason for withdrawal or express findings on contract breach, flooding or groundwater. Registry file VIC-S-S-233282.

Where to look: Pages 1–2; dismissal terms and paragraph 2.

Technical report · 61 pages · 19.3 MB

NHC flood mitigation design — February 2025

Supports mitigation of transferred flood risk; identifies limits, complementary Lot 2 works, sequencing and maintenance. Does not promise an end to existing regional flooding.

Where to look: PDF pages 19–20 / printed pages 13–14.

Technical report · 91 pages · 43.2 MB

Western Water seawater intrusion assessment — August 13, 2025

Expects no significant impacts for active groundwater users within its assessed scope. Addresses well integrity, limited shallow-aquifer information and recommended monitoring. Does not establish that owners are overpumping.

Where to look: PDF pages 2–4 and 37–38; executive summary and sections 10–11.

Technical report · 38 pages · 18.8 MB

NHC channel and marsh restoration design — July 2025

Explains proposed habitat features and design phases. A design report is not evidence that every proposed feature is permitted, complete or operating as designed.

Where to look: Design description and drawings; read alongside the separate mitigation report.

Party submission · 6 pages · 0.2 MB

Land Keepers legal submission to the ALC

Sets out Land Keepers positions and identifies the earlier judicial review. Allegations and legal arguments are not adjudicated findings; the later dismissal order controls the old petition status.

Where to look: All six pages. Referenced attachments are not included in this PDF.

Support letter · 2 pages · 0.3 MB

Cowichan Tribes support letter — February 20, 2025

Documents institutional support, partnership and community participation. Does not establish unanimous support or consultation of every neighbouring property owner.

Where to look: Both pages.

What this collection does not settle

The original purchase offer and October 1990 amendment remain sought. The consent order does not state why the petitioners agreed to dismissal. Further FOIs have been reported but have not been received or reviewed; no conclusion about their contents is offered.

Private legal advice and unreviewed supplied FOIs are not included. Public-source PDFs are preserved without alteration. The court order was obtained from BC Court Services Online; the original registry link may require paid access. Page references refer to PDF page numbers unless printed pages are identified.

File details and verification hashes (JSON)